Activity A.3.

RePeat RePeat
Activity A.3.

Sub-activity A.3.1.
Recommendations of technical solutions for optimizing the water regime of peatland ecosystems

Sub-activity A.3.2.
Maintenance activities for water supply systems of peatlands

Sub-activity A.3.3.
Installation of dams / locks of suitable materials on drainage channels, for the purpose of retaining water in the peatland ecosystems belonging to the Center region

Sub-activity A.3.4.
Removal of the existing drainage channel; covering of the concrete well

Sub-activity A.3.5.
Infrastructure development for optimizing the water regime of the peat bog – outsourced action

Rehabilitation of wetlands and peatlands in the Center Region (RePeat)
icdcrm.miercureaciuc@asas.ro
Mun. Miercurea Ciuc, str. Progresului, nr. 35/B, cod poștal: 530240
0366-100 203
Copyright © all rights reserved 2025